Inside EASTTOP: How We Test Every LED Light Before Shipment
Every lighting project is a promise made for ten years. Testing is how we keep that promise before a single fixture leaves the factory.
Each production batch passes four gates: incoming material inspection (LED bins, driver批次, battery cells), in-line assembly checks, a 24-hour aging run at full load, and final pre-shipment sampling with photometric verification.
Outdoor products additionally face accelerated environment tests on a scheduled cycle: salt-spray for coastal projects, IK09 impact for vandal-prone areas, and thermal cycling from -30°C to 55°C.
Clients receive batch QC documentation with every shipment — so what arrives is provably what was approved.